It has been a while since I posted anything, I have been busy, just not everything was done for the house. I did complete a restructure of the east deck. It was 16 x16 and using the support boards and deck block it is now 7 x 30 running down the length of the addition. It's nice to have, great to sit out under the overhang and simpler to access the rest of the yard. I did modify the north stairs to be able to be removed easily because under the patio stones in the middle of the stairs is the septic access point. I just have to remove the top back board, then four bolts and the steps pull away. I built last year a flower box that splits the front to help separate the change is step down. And recently I made a curved flower box at the end for the same purpose. We also redid the patio stone walkway to the house. Here is what we now have.
Parallel Journeys: Two Mentorships
14 years ago