Well the baseboards are in and painted, it has taken a while to get the far, a few things got in the way like taking a trip for our 25th, just say'n. Anyway I've cut, profiled, sanded, primed, painted and installed about 110 liner feet of 8 inch baseboard and the same for the ¾inch quarter round, since the doors were framed and trimmed out. Since Thursday I filled the nail holes, closed up some gaps with silicon to hide the imperfections of the wall's, wood and maybe, just maybe my work. Then they were sanded, primed, and painted. Along with all the existing window and door frames, to clean up them up because since they were installed a year and a half ago we've added heat to the house and over the past year the wood has dried out some, so they needed attention. And we finally painted the front door, what a difference.
 |
The door before. |
 |
Much better. |
 |
Looking into the house. |
 |
In the hall. |
 |
The other side of the hallway. |
 |
The dining room. |
 |
By the kitchen. |
 |
Sides of the fridge. |
 |
Living room. |
 |
The only the part of the living room you can see. |