Tuesday, June 30, 2015

Inspiration Galore

As promised here is the floor, it is "Giverny Violet", the second coat is still wet in spots so it looks a little patchy right now. It will be a bit darker when dried. It's not the greatest paint, it will work until she finds something she likes, we don't want to rush it.

Lots of inspiration.

Monday, June 29, 2015

Adding A Bit Of Color

The ceiling has bee painted and today I added a bit of color to the walls, it's called "Spring Blossom". We'll be tackling the last 8 feet soon, I think she wants to paint the floor first, I'll wait to show pictures before I tell you what color it will be.





Sunday, June 28, 2015

Power, Rock & Mud Part 2 & 3

The last post showed the power portion of "Power, Rock & Mud" now you can see what we've been up to these past several days. The Rock and Mud parts are done and so is the primer coat and the ceiling has been painted. Long days and very sore after but a job well done. I think I have to give the ceiling another coat before the green walls get done. The hardest and longest part of the this job has been the little bump out, it has turned into the bump out from hell, so many corners and a tight space to work in. The last 8 feet behind the plastic will be a breeze.

Looking into the studio.

The bump out from hell.

Lots of rock on the walls.

More rock.

The look back into the house.

Three coats of mud done.

This is a hard place to work.

Starting to look better.

Much better with primer.

It tuned out rather nice.

Looking good.

Almost done, this part anyway.

Sunday, June 21, 2015

Power, Rock & Mud

This is the order of work ahead of us so we can get the second floor addition finished, at least the lions share of the work. The store room walls went in earlier in the month and our electrician came and saw what we wanted to do for lights and plugs and is OK with me doing the labor part, sweat equity is great. He will take care of all the plugs and lights as well as connecting everything to the panel, after all it is his license. That's the "Power" part of this job. It took a few days but, the wiring is in place and we'll be starting the dry wall tomorrow, we are a little sore after carrying 30 sheets up the stairs, and this is only for half the room, and not even the inside of the store room. This is the "Rock" part of the job. Then the "Mud" part of the job will start and after that priming and painting. Then we do the other half of the room. You see, it is still full of supplies and things. Here are a few dull pictures of where everything is going. Tuck tape repairs all.

Access to the panel below.

Positioning a floor mounted plug and running wires.

Just a couple of future switches.

Plugs under the windows on the west wall.

Plug and HDMI cable access for TV.

Plug under an east window.

One of four lights, two in the studio.

North end of the studio light.

Store room light location.

Just in, the hallway light.

Sunday, June 7, 2015

Keeping Busy

We have been keeping busy even though it may not seem like it. I've gotten a few projects done and out of the way, like adding the top piece to the kitchen cabinets, building a new stand in the cold room, building more hive parts and frames getting ready for bees. And putting up a couple of walls in the second floor addition, getting ready for the electrician to do their thing. We also had a hands on day with a couple who have about 135 hives, we helped them split some as several were stronger than others and they were getting ready to send them off to the blueberry fields. We only worked one day they were doing about 30 of them. A great learning experience and we got a lot of info from them. So here are a few pictures of our recent work.

Remember July last year the gap at the top, now gone.

Getting read for the crown molding now.

Filled in above the pull outs.

New stand in the cold room.

Store room walls.

You can just see the other wall.