| This is about where it will go, at least the wire is run. |
| The kitchen's west wall done. |
| Most of the north wall is done, a little more and that's it. Warm. |
This site is a visual record of the renovations on our home in Searsville.
| This is about where it will go, at least the wire is run. |
| The kitchen's west wall done. |
| Most of the north wall is done, a little more and that's it. Warm. |
| Looking down the line where the cook top and sink will be. |
| Looking in from the dining room. The light over the sink is independent, as is the pantry light. |
| Over the future TV built in and new custom book cases. I'll be busy later on. |
| Switches for the lights. One for over the sink and the other for the rest. |
| I think I have them in a strait line. The one with the bulb on the left will go in the pantry. |
| Just had to drill a few holes to get the wires run safely. |
| This is the cook top line, I had to drill through the sill beam, and I felt better having a nailing plate over the wires path. Not that anything will happen, I just want to be careful. |
| Feed line for a new GFI plug on the right side of the sink. |
| The location of the new plugs and switches. One of the switches at the end will control the light over the sink, the other is for the other three kitchen lights. |
| Everything was already in or behind the shed. |
| The old kitchen and dining room floors I couldn't save. |
| It does add up. |
| The back side of the mountain. |
| This is what it looked like when we started. |
| The wood is gone. |
| The mountain is gone. |
| Lots of room now. |
| It took an hour to load the wood. |
| About 1½ hours after the wood was on we were done. |
| This is what it looked like when we moved in, lines everywhere. |
| Just the fire box left. |
| A little work with the old tin and a cap plugs the chimney. |
| You may be able to see the new studs I put in and the mock up give you an idea of what space will be used up. |
| Just a shot of the living room wall with the drywall removed. |
| This is what it looked before I started. |
| The siding come off and I was able to use some of it to replace borken sections. |
| This is with the Styrofoam insulation removed. |
| The window is in, the blue is a rubber sill gasket. |
| Out with the old, notice the size of the hole compared to that little window size. Inside it was built up on the sides by about 4 inches, and had to be removed. |
| Reused the Styrofoam insulation and sealed it up, after a bit of framing inside. |
| And 9 hours later with the siding back up we're done. Did you notice from the first picture to this one the sun coming around. |
| The inside look and you can see were the old window was. |
| The top and bottom horizontal boards are temporary to show you where the window will go and the size. |
| The before shot. |
| The after shot. |
| The south dining room wall. |
| The west wall. |
| I moved the window location over, it is centered now. |
| The counter and upper cabinet are better defined. It opens it up a bit more. |
| New plug on the left and moved the other one up, to accommodate the size of our baseboards. |
| New plug for a hidden TV and relocated the light switch. |
| New (updated) wiring for the light, and run safely. |
| The plug on the right is dedicated for the fridge. |