| A 9 foot run of brick to remove. |
| 6 feet left. |
| 4 to go. |
| Looking back up. |
| Almost done. |
| Covered over to keep things out. |
This site is a visual record of the renovations on our home in Searsville.
| A 9 foot run of brick to remove. |
| 6 feet left. |
| 4 to go. |
| Looking back up. |
| Almost done. |
| Covered over to keep things out. |
| Before I started. |
| Below the roof line now. |
| This is what the clay liner looked like, not very good. |
| What I had to work with in the attic. |
| Slowly coming down. |
| Gone. |
| New shingles. |
| New Look. |
| Up on high. |
| A better perspective to where I actually was. |
| Looking south. |
| West view. |
| Northwest view. |
| Looking north. |
| A 20 inch King Industrial Planner |
| 6 inch King Industrial Jointer |
| You can see the yellow switch boxes, one for the dust collector and the other the tables saw. |
| My little tool trolley |
| Fits safely out of the way. |
| Everything in it's place and handy. |
![]() |
| A look before I started. |
![]() |
| Not much room to move around. |
| After cutting away the dry wall to relocate the line I noticed no bat insulation. More blown in work needed. |
| Patched up. |
| Mud applied, sanded and primed. |
|
A little more
organized.
|
| Room to work. |
| Things getting put in place. |
| Almost looks like a shop now. |
| Rubber and foam pads for the work area to save my joints from standing on concrete. |