Sunday, September 29, 2013

More Chimney Work

Today we hammered away at the second floor section. I was very lucky there was a void beside the chimney and I could get one section of an 8 foot ladder down there so I could work my way down. We first hauled all the brick up the back stairs to the trailer to make room for today's efforts, and again hauled them up to the trailer. Tomorrow hopefully will be a little easier, no stairs, we are working on the first floor run in the kitchen.
 
A 9 foot run of brick to remove.

6 feet left.

4 to go.

Looking back up.

Almost done.

Covered over to keep things out.

Making Room For Heat

We are about to get a new heating system and the best way to run the duct work is up the same spot the chimney occupies, so guess what has to go. It was a shame to take it down, and it took a lot to do it, and we still have more to do, about 15 feet worth. Once I got the exterior work done I worked in the attic. Then I boarded up the opening and shingled it making it water tight once again. What we did was I would chisel away at each brick, and I mean each one, they were in place and very study, then drop in down the flu pipe, ReBecca was in the basement and would pull out the  brick and all the debris like the clay lining and extra mortar the fell. We both had on respirators but it was still very dirty and we are beat. Still more to do.


Before I started.

Below the roof line now.


This is what the clay liner looked like, not very good.

What I had to work with in the attic.
Slowly coming down.

Gone.

New shingles.

New Look.

Friday, September 27, 2013

Getting Ready For The Chimney

We will be knocking down the chimney soon, and to make my job on the roof a bit easier I added a piece of plywood to the existing frame work up there, making it a bit sturdier. We don't have too many courses of bricks to come down from the roof top, but it's better to be a little safer all the same. I told ReBecca the view was great from up here (there) so she climbed up to see for her self.


Up on high.

A better perspective to where I actually was.





Looking south.


West view.

Northwest view.

Looking north.


Always time for a picture.
Discussing the job.



Something For The Shop

I got last week a couple of new tools, at least new to me, from my bother-in-law. I picked up a 20 inch planer and a 6 inch jointer. My old planner was 12 inches and did a lot of work over the years, including the floors, as well as my jointer. But it was time to upgrade. As well I hooked up a remote start for the dust collector, one switch box on the dust collector and each tool has a switch box so when the tool is turned on the dust collector starts and when the tool is turned off the collector runs for about 10 seconds to clear the line and shuts down. My father-in-law had them hooked up, now I use them.

A 20 inch King Industrial Planner


6 inch King Industrial Jointer
You can see the yellow switch boxes, one for the
dust collector and the other the tables saw.

Wednesday, September 11, 2013

The First Project

With the new shop is up and running it was only fitting that the first project be for the shop. The project is this little stand for my table saw accessories, the push sticks, different inserts and fence guards. Before they were piled up on an old three leg round table the was not very sturdy and when ever I used the crank to tilt the blade I would hit my hand. Now it's all safely out of the way and on wheels. Keep an eye on my other blog, "WP Wood Working", for any projects I make they'll be posted there.

My little tool trolley

Fits safely out of the way.

Everything in it's place and handy.

Tuesday, September 10, 2013

The Shop

While we wait for quotes to have work done on the house, like heat, kitchen, extension and addition I have had some time to work on getting the shop straitened up, a bit. I started before I went to Ontario for my sister’s birthday and have been picking away at it since. There is more to do and when the addition gets built with the greatly needed storage space, I'll have a little more room in the shop. For now it's temporary and I can work around it. Here is how things went; I also had to relocate a 220 line for the table saw.

A look before I started.
Not much room to move around.
After cutting away the dry wall to relocate the line I noticed
no bat insulation. More blown in work needed.


 
Patched up.




Mud applied, sanded and primed.
A little more organized.

Room to work.
 

Things getting put in place.

Almost looks like a shop now.


Rubber and foam pads for the work area to save my joints
from standing on concrete.