Showing posts with label Shop Heat. Show all posts
Showing posts with label Shop Heat. Show all posts

Thursday, December 12, 2013

Add A Little Propane

The shop heating system is done, the propane tank was installed today and all is good. It is nice to have it warm to be able to work. No excuses now, maybe one, I still need some room to work and I'll have it soon as they are progressing on the second floor addition nicely.

He'll have to wait until it warms up a bit to paint the pipes.

Monday, December 9, 2013

Turning Up The Heat

The shop heater got installed today, they still have to come back with the large tank and do a final check, time ran out today and got dark. He installed black pipe for the propane line and he will paint it for a more finished look. With the heat on I can start the kitchen cabinets, that is when I get some of the stuff out of the shop and make room to work. Soon, very soon.

 
A 45K BTU Modine Hot Dawg heater, lots of heat.