Monday, December 9, 2013

Turning Up The Heat

The shop heater got installed today, they still have to come back with the large tank and do a final check, time ran out today and got dark. He installed black pipe for the propane line and he will paint it for a more finished look. With the heat on I can start the kitchen cabinets, that is when I get some of the stuff out of the shop and make room to work. Soon, very soon.

 
A 45K BTU Modine Hot Dawg heater, lots of heat.

No comments:

Post a Comment