Today is NB Day and a rest day, so my work load should be light today. HA. I didn't do anything big or get into heavy construction. Just cleaned up some things, did a couple of little projects that needed to be done and are now out of the way.
I pulled out all the duct work in the basement, sanded and added more mud to the opening I made earlier to fix a little plumbing mix up, removed a plug and did a little rewiring, ran satellite cable, got it in place and out of the way. And one last thing cleaned up the door way I made in April between the master bedroom and the dressing room, it was not cut out properly the first time. Like I said a light days work.
This is the opening from the dressing room side, the plug is still in the way and not a very strait cut on the right.
All better now, plug removed, opened up a bit more and straitened out the right side. Ready for framing.