This is the order of work ahead of us so we can get the second floor addition finished, at least the lions share of the work. The store room walls went in earlier in the month and our electrician came and saw what we wanted to do for lights and plugs and is OK with me doing the labor part, sweat equity is great. He will take care of all the plugs and lights as well as connecting everything to the panel, after all it is his license. That's the "Power" part of this job. It took a few days but, the wiring is in place and we'll be starting the dry wall tomorrow, we are a little sore after carrying 30 sheets up the stairs, and this is only for half the room, and not even the inside of the store room. This is the "Rock" part of the job. Then the "Mud" part of the job will start and after that priming and painting. Then we do the other half of the room. You see, it is still full of supplies and things. Here are a few dull pictures of where everything is going. Tuck tape repairs all.
 |
Access to the panel below. |
 |
Positioning a floor mounted plug and running wires. |
 |
Just a couple of future switches. |
 |
Plugs under the windows on the west wall. |
 |
Plug and HDMI cable access for TV. |
 |
Plug under an east window. |
 |
One of four lights, two in the studio. |
 |
North end of the studio light. |
 |
Store room light location. |
 |
Just in, the hallway light. |
No comments:
Post a Comment