Saturday, May 11, 2013

There's Always Something To Do

With the lions share of the reno done, at least what I can do for now, it`s back to completing some of the other jobs that didn`t get done earlier. This job is to build the doors for the cupboards over the tub. I have to make the frames and then the doors. The doors will fit flush with the low profile frames and as you can see everything will be painted the same colour as the walls to try and hide them a bit. We don't`what them to jump out at us, after all they are only cupboards.

The frames will have mitered corners and
attached with biscuits and glue.

The right side has a little bump out because of the
exhaust hose from the bathroom fan.

No comments:

Post a Comment