| Just piled up hard to get at. |
| Bottom insert, nice and organized. |
| Top tray, with what we use most. |
| Fits nicely into the middle drawer. |
This site is a visual record of the renovations on our home in Searsville.
| Just piled up hard to get at. |
| Bottom insert, nice and organized. |
| Top tray, with what we use most. |
| Fits nicely into the middle drawer. |
| Just cut out the wall and add the boxes. |
| Bins for the nests. |
| We'll see if they require modifying later on. |
| Setting the footings. |
| Getting the floor joists in place. |
| Add two layers of 1 x 6 spruce flooring. |
| Put up a few walls. |
| Up go the rafters. |
| Cover it with sheathing. |
| Finish the roof off with steel. |
| Gable vents. |
| Half for the hens, all covered with wire. |
| They need a place to sit. |
| Can always use a bit of light. |
| Add the run and some stain. |
| Now we have a cute hen house and run. |
| Out the side door. |
| From the shop door. |
| Not very efficient. |
| Hard to get at things. |
| Much better. |
| Slide the KFS to one side and get at the pizza cutter. |
| Move the two holders to the right and more KFS. |
| A little tape and mud. |
| Tiding up the wall. |
| Starting to look better. |
| Primer cleans it up. |
| Primer helps cover the old blue. |
| A new look. |
| It looks great. |
| Before the work. |
| After the primer coat is on. |
| You can see the jig in place. Actually screwed to the bench. |
| This worked very well, moving from font to back a lot. |