Saturday, August 18, 2012

More Prep Work

Today I laid three sheets of ¼ inch meranti plywood to clean up the floor so while still working on the walls everything won't fall through the sub floor to the front entrance. It make working a bit easier. I also started to position the lights ReBecca wants for this space and a plug. It took a while to fish the line to a plug in the dressing room but with a little persistence and effort the wires are laid and I'll be ale to put the temp fitting in next.
One picture today, but it has everything in it. The plywood I laid, and the openings in the lath for the lights and plug. The plug will go on the left side of the room. It was going on the right side but where we want the light to go would put the plug out of alignment to the light because of the stud location and the plug position on the other side of the wall. So I can make it work on the left side instead. As long as we get a plug it will be just fine.