The weather is still not co-operating, the crew came out yesterday and finished off the veranda soffets and along the north (back) side. It rained hard later in the afternoon and the wind came up. Today it's not bad just -13°C but with the wind it's down to -25, not nice. I added a picture of the built-ins and oven cabinet, in the dry fit stage. The built-ins are painted and I have poly inside the cabinets, next the paint for the face and drawers to be built and installed. After that I should be able to get them in.
 |
| Every bit helps. |
 |
| Just like it should have been there all along. |
 |
| Looks good. |
 |
| A glimpse of what is coming. |
I definitely agree with your roof angle design decision - it looks great.
ReplyDelete