I'm still here and working, some of what I have been doing really doesn't show well in pictures. Let me see, where do I start, I put on the edge banding on the base cabinets and they are painted, 3 coats. I applying poly to several sheets of plywood for the drawers. Each sheet of ½ inch got three coats per side and the sheet and a half of ¼ inch only to one side. During all this I did manage to get some time in at the golf club, a good rest and needed distraction. Back to work this past weekend and this week. We picked up the bottom mounted soft closing drawer slides and hinges on Friday so I'll have the proper measurements for the drawers, they are a little different then the side mounted ones. I then cut the boards to finished dimensions and have spent the last day and a half putting on the edge banding. Tomorrow I'll cut the groves for the bottoms, and then start on the dovetails for the drawers, its all set up and ready to go. Did I mention there are 11 drawers.
 |
You can see the finished base cabinets, the bottoms for the
drawers and the two boxes of hardware. |
 |
| The other base cabinets waiting to be installed. |
 |
It may not look like much but there are the drawers.
You can see in the foreground a sample drawer made up
to make sure it goes well. |
No comments:
Post a Comment