Saturday, July 4, 2015

A Very Busy Day

Yesterday was a very busy day, right away I put some mud on spots that needed touching up. While it was drying I picked up the pine ( 1 x 2 x 14 ft) and ReBecca was in town to see what shelving parts were available. After that we went into Saint John to do a little shopping, and get additional shelving parts that weren't available in town. It was a very quick trip, two stops and lunch all in under two hours. Once we got home I got busy sanding the touch ups, I vacuumed and mopped the floor, pulled down the plastic patrician and primed everything. Then two coats of ceiling paint, two coats of wall paint and a good coat on the floor to dry over night. All in all a very good day. Today the shelf wall mounts and brackets are up and the shelves will be up soon, once they are cut to desired length, those pictures later.

Primers on.
Ceiling is done, two coats.

Two coats on the walls.

Add a touch of color to the floor and it's done. 